Insurance Claims › Permits, Inspections & Engineers
Building Permits, City Inspections and Engineers After a Fire
Most restoration companies never talk about this part. Here’s what the building department, the city inspector and a structural engineer actually need from you after a fire, water or storm loss in Michigan, and how we handle all of it.
“Anybody Can Advertise Fire Damage. This Is the Part That Decides How Your Rebuild Goes.”
Cleaning up after a fire is the part everyone sees. What nobody tells you is that the rebuild runs through your city hall. Before we can put up one sheet of drywall, the city wants a permit. Before we close a wall, an inspector has to see the framing, the wiring and the plumbing. If the fire got into the roof or the floor joists, the city may want an engineer to sign off that the house is safe to rebuild the way we’re planning.
When that part is handled wrong, jobs sit for weeks. The inspector fails the rough-in, a wall has to be opened back up, or the final never gets scheduled and your mortgage company won’t release the last draw. I’ve been doing this since 1993, and I can tell you the permit and inspection side is where a lot of rebuilds go sideways.
We pull the permits under our own builder’s license, we know the building departments in Macomb, Oakland and Wayne County, and we stay on it until the final inspection is signed.
— Bryan, owner of Select Restoration
Permits Protect Your House, Your Claim and Your Sale Later
A permit isn’t just red tape. It’s the city’s record that the rebuild was inspected and done to code. That record matters long after the dust settles.
- Your mortgage company often wants the final city inspection before releasing the last draw
- If your city is holding part of your fire money, a city inspection is one way to show the work is done
- Unpermitted work can cause problems when you sell or refinance
- Inspections catch hidden fire and water damage before the walls are closed
- Your homeowner’s policy may cover some code-required costs, so the permit record helps document them
Red Flags From a Contractor
- Asks you to pull the permit in your name
- Says “we don’t need a permit for this” on a fire rebuild
- Closes walls before an inspection
- Won’t show you their Michigan builder’s license
- Has no plan for the final inspection
The Permits a Fire Rebuild Usually Needs
Every city and township sets its own rules, so this is a general guide. What your job needs depends on how far the damage went.
How Permits and Inspections Usually Work on a Rebuild
When You Need a Structural Engineer After a Fire
Fire burns through wood and heat weakens steel. If the damage reached the parts that hold the house up, the building department and your insurance adjuster may want a professional engineer’s opinion before rebuilding starts.
We work with licensed engineers who know fire-damaged homes. We get them out to the house, get their letter or sealed drawings to the building department, and make sure their repair plan is part of the scope your adjuster reviews. When a structure is unsafe in the meantime, we can shore it up so it’s safe to work in.
Rebuilding Means Bringing Things Up to Today’s Code
When part of a house is rebuilt, the new work generally has to meet the current Michigan Residential Code, not the code from when your house was built. That can add items your old house never had.
Your City May Be Holding Part of Your Fire Money
In many Michigan cities, the insurance company has to send part of a fire settlement to the city treasurer until the house is repaired or removed. For 2026, that can be up to $16,383 on a home. The city releases it when it gets proof the work was done, and a final city inspection is one way to show that.
What you do
- Sign the contract and any permit authorization forms
- Make the house available for inspections
- Tell us about any letters from your city
- Pick your materials in our showroom
What we do
- Pull every permit under our builder’s license
- Bring in a structural engineer when needed
- Schedule and meet every inspector
- Fix any correction items and close out the permits
- Send the final sign-off to your lender and city
Frequently Asked Questions
Do I need a building permit to repair fire damage in Michigan?
In most cases, yes. Repairing or replacing framing, roofing, wiring, plumbing or heating after a fire usually needs permits from your city or township building department. Requirements vary by community, so we confirm with your building department before work starts.
Who should pull the permit, me or my contractor?
Your licensed contractor should. Select Restoration pulls permits under our own Michigan residential builder’s license. Be careful if a contractor asks you to pull the permit in your name, because that can make you responsible for the work.
How many inspections does a fire rebuild need?
It depends on the job, but a typical rebuild has rough inspections for framing, electrical, plumbing and mechanical before walls are closed, often an insulation inspection, and final inspections at the end.
When do I need a structural engineer after a fire?
When fire, heat or firefighting water may have damaged the parts that hold the house up, like roof trusses, rafters, floor joists, beams, bearing walls or the foundation. Your building department or adjuster may ask for an engineer’s letter or sealed drawings before rebuilding.
What is an engineer’s letter?
A report from a licensed professional engineer saying what’s damaged and how it should be repaired. Building departments and insurance adjusters often use it to decide what can stay and what must be replaced.
Does my insurance pay for a structural engineer?
It often can as part of the cost to repair the damage, but every policy and claim is different. Ask your adjuster. We include engineering in the scope of work so it can be reviewed.
Do I have to bring my whole house up to code after a fire?
Generally, the parts you rebuild have to meet current code, not the whole house. Your building inspector decides what applies to your job.
Will insurance pay for code upgrades?
Many homeowner’s policies include ordinance or law coverage that pays for some code-required costs, up to a limit. Coverage varies, so check your policy and talk to your adjuster. We list code items separately in our estimate so they’re easy to review.
How long does it take to get a permit after a fire?
It varies by community and how much paperwork the job needs. Simple permits can be quick, while jobs that need engineering or drawings take longer. We submit as soon as the scope is set to keep the job moving.
Can work start before the permit is issued?
Emergency work like board-up, tarping, water removal, cleanup and shoring usually happens right away to protect the house. Rebuilding work generally waits for the permit.
Why does my mortgage company want the city inspection?
Many lenders want proof the repairs are done before releasing the final draw. A passed final inspection is common proof, so we send it to your lender.
What happens if the work fails an inspection?
The inspector leaves a correction list. We fix the items and schedule a re-inspection, at no extra cost to you for our own work.
Do you need a permit to tear down a fire-damaged house or garage?
Yes, demolition normally needs a permit, and utilities like gas, electric and water have to be shut off and disconnected first. Some communities also require an asbestos check before demolition.
Do you work with architects too?
Yes. If you want to change the layout or add on while rebuilding, we bring in an architect or engineer for the drawings the building department needs.
Permits & Inspections in Macomb, Oakland & Wayne County
We pull permits and work with building departments throughout Macomb County, Oakland County and Wayne County, including Sterling Heights, Warren, Clinton Township, Macomb Township, Shelby Township, St. Clair Shores, Roseville, Eastpointe, Troy, Rochester Hills, Royal Oak, Southfield, Livonia, Dearborn and Detroit.
Keep Reading
Let Us Handle the City
Permits, inspectors, engineers and the final sign-off. Call us and we’ll walk you through what your rebuild needs.

